    Decision Summary

Decision Notes:  
DECISION APPROVED THE REBASED RAIL COST ADJUSTMENT FACTOR INDICES SUBMITTED BY THE ASSOCIATION OF AMERICAN RAILROADS TO THE BOARD FOR THE FIRST QUARTER OF 2013.

    Decision Attachments

120 KB
32 KB

Approximate download time at 28.8 kb: 72 Seconds

Note:
If you do not have Acrobat Reader, or if you have problems reading our files with your current version of Acrobat Reader, the latest version of Acrobat Reader is available free at www.adobe.com.

    Full Text of Decision

40473

42817                  SERVICE DATE – LATE RELEASE DECEMBER 20, 2012

EB

 

SURFACE TRANSPORTATION BOARD

 

DECISION

 

Docket No. EP 290 (Sub-No. 5) (2013-1)

 

QUARTERLY RAIL COST ADJUSTMENT FACTOR

 

Digest:[1]  The rail cost adjustment factor (RCAF) is an index formulated to represent changes in railroad costs incurred by the nation’s largest railroads over a specified period of time.  The statute requires the Surface Transportation Board to publish the RCAF on at least a quarterly basis.  Each quarter, the Association of American Railroads computes three types of RCAF figures and submits those figures to the Board for approval.  In addition, a new base level for the index is calculated here, as the statute requires be done every five years.  The Board has reviewed the submission and adopts the RCAF figures for the first quarter of 2013.

 

Decided:  December 19, 2012

 

In Railroad Cost Recovery Procedures, 1 I.C.C. 2d 207 (1984), the Interstate Commerce Commission (ICC) outlined the procedures for calculating the all-inclusive index of railroad input prices and the method for computing the rail cost adjustment factor (RCAF).  Under the procedures, the Association of American Railroads (AAR) is required to calculate the index on a quarterly basis and submit it to the agency on the fifth day of the last month of each calendar quarter.  In Railroad Cost Recovery Procedures—Productivity Adjustment, 5 I.C.C. 2d 434 (1989), aff’d sub nom. Edison Electric Institute v. ICC, 969 F.2d 1221 (D.C. Cir. 1992), the ICC adopted procedures that require the adjustment of the quarterly index for a measure of productivity.

 

The provisions of 49 U.S.C. § 10708 direct the Surface Transportation Board (Board) to continue to publish both an unadjusted RCAF and a productivity-adjusted RCAF.  In Productivity Adjustment—Implementation, 1 S.T.B. 739 (1996), the Board decided to publish a second productivity-adjusted RCAF called the RCAF-5.  Consequently, three indices are now filed with the Board:  the RCAF (Unadjusted), the RCAF (Adjusted), and the RCAF-5.  The RCAF (Unadjusted) is an index reflecting cost changes experienced by the railroad industry, without reference to changes in rail productivity.  The RCAF (Adjusted) is an index that reflects national average productivity changes as originally developed and applied by the ICC, the calculation of which is currently based on a 5-year moving average.  The RCAF-5 is an index that also reflects national average productivity changes; however, those productivity changes are calculated as if a 5-year moving average had been applied consistently from the productivity adjustment’s inception in 1989.

 

As required by statute, the denominator of the RCAF is to be rebased every five years.  The Board has verified AAR’s proposed rebasing calculations and they comply with the statute.  The rebasing calculations are shown in Table C of the Appendix.

 

The index of railroad input prices, RCAF (Unadjusted), RCAF (Adjusted), and RCAF-5 for the first quarter 2013 are shown in Table A of the Appendix to this decision.  Table B shows the third quarter 2012 index and the RCAF calculated on both an actual and a forecasted basis.  The difference between the actual calculation and the forecasted calculation is the forecast error adjustment.

 

            We have examined AAR’s calculations, and we find that AAR has complied with our procedures.  We find that the first quarter 2013 RCAF (Unadjusted) is 0.997, a decrease of 0.3% from the fourth quarter 2012 RCAF of 1.000.  The RCAF (Adjusted) is calculated, in part, using the RCAF (Unadjusted) and a 5-year moving geometric average of productivity change for U.S. Class I railroads from 2006-2010, which is 1.008 (0.8% per year).  We find the RCAF (Adjusted) is 0.435, a decrease of 0.5% from the fourth quarter 2012 RCAF (Adjusted) of 0.437.[2]

 

In accordance with Productivity Adjustment—Implementation, 1 S.T.B. at 748-49, the RCAF-5 for this quarter will use a productivity trend for the years 2006-2010, which is 1.008 (0.8% per year).  We find the RCAF-5 for the first quarter of 2013 is 0.411, a decrease of 0.5% from the fourth quarter 2012 RCAF-5 of 0.413.[3]

 

This decision will not significantly affect the quality of the human environment or the conservation of energy resources.

 

Authority:  49 U.S.C. § 10708.

 

It is ordered:

 

1.  The Board has approved the first quarter 2013 RCAF (Unadjusted) of 0.997, RCAF (Adjusted) of 0.435, and RCAF-5 of 0.411.

 

2.  Notice of this decision will be published in the Federal Register.

 

3.  The effective date of this decision is January 1, 2013.

 

By the Board, Chairman Elliott, Vice Chairman Mulvey, and Commissioner Begeman.


 

APPENDIX

 

TABLE A

 

EP 290 (Sub-No. 5) (2013-1)

All Inclusive Index of Railroad Input Costs

(Endnotes Following Table B)

 

LINE NO.

INDEX COMPONENT

2011 WEIGHTS

FOURTH QUARTER 2012 FORECAST

FIRST QUARTER 2013 FORECAST

1

LABOR

31.3%

390.5

389.7

2

FUEL

22.5%

403.3

396.5

3

MATERIALS AND SUPPLIES

5.1%

266.1

263.4

4

EQUIPMENT RENTS

5.6%

205.7

206.7

5

DEPRECIATION

11.6%

213.2

212.2

6

INTEREST

2.5%

92.9

92.9

7

OTHER ITEMS[1]

21.4%

218.0

218.8

8

WEIGHTED AVERAGE

100.0%

311.8

310.0

9

LINKED INDEX[2]

 

299.0

297.3

10

PRELIMINARY RAIL COST ADJUSTMENT FACTOR[3]

 

100.5

99.9

11

FORECAST ERROR ADJUSTMENT[4]

 

-0.005

-0.002

12

RCAF (UNADJUSTED) (LINE 10 +LINE 11)

 

1.000

0.997

13

RCAF (ADJUSTED)

 

0.437

0.435

14

RCAF-5

 

0.413

0.411

 


TABLE B

 

EP 290 (Sub-No. 5) (2013-1)

Comparison of Third Quarter 2012 Index

Calculated on Both a Forecasted and an Actual Basis

 

 

Line

No.

 

Index

Component

 

2010

Weight

 

THIRD

quarter

2012 Forecast

 

THIRD

quarter

2012

Actual

 

1

 

Labor

33.3%

391.4

391.4

 

2

 

Fuel

18.0%

353.4

359.0

 

3

 

Materials and Supplies

5.0%

274.8

274.8

 

4

 

Equipment Rents

6.2%

205.8

203.6

 

5

 

Depreciation

12.8%

211.7

210.8

 

6

 

Interest

2.9%

90.6

90.6

 

7

 

Other Items

21.8%

221.6

216.8

 

8

 

Weighted Average

100.0%

298.5

298.2

 

9

 

Linked Index

 

289.4

288.8

 

10

 

Rail Cost Adjustment Factor

 

97.3

97.1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TABLE C

 

Rebasing the Denominator of the RCAF

to the Fourth Quarter 2012 Level

 

 

 

 

1.

 

Fourth Quarter 2012 Linked Index

 

299.0

 

2.

 

Second Quarter 2012 Linked Index

Calculated Using Actual Data

295.2

 

3.

 

Second Quarter 2012 Linked Index

Calculated Using forecasted Data

296.7

 

4.

 

Difference

-1.5

 

5.

 

Rounding adjustment to force 1.000

 

0.0

 

6.

 

Fourth Quarter 2012 Linked Index Adjusted for Second

Quarter 2012 Forecast Error (Line 1 plus Line 4 plus Line 5)

 

297.5


Endnotes:



[1]  The digest constitutes no part of the decision of the Board but has been prepared for the convenience of the reader.  It may not be cited to or relied upon as precedent.  Policy Statement on Plain Language Digests in Decisions, EP 696 (STB served Sept. 2, 2010).

[2]  The first quarter 2013 RCAF Adjusted (0.435) is calculated by dividing the first quarter 2013 RCAF Unadjusted (0.997) by the first quarter productivity adjustment factor of 2.2907.  The first quarter 2013 productivity adjustment factor is calculated by multiplying the fourth quarter 2012 productivity adjustment of 2.2861 by the fourth root (1.0020) of the 2006-2010 annual average productivity growth rate of 0.8%.

            [3]  The first quarter 2013 RCAF-5 (0.411) is calculated by dividing the first quarter 2013 RCAF Unadjusted (0.997) by the first quarter productivity adjustment factor-5 (PAF-5) of 2.4279.  The first quarter 2013 PAF-5 is calculated by multiplying the fourth quarter 2012 PAF-5 of 2.4231 by the fourth root (1.0020) of the 2006-2010 annual average productivity growth rate of 0.8%.



 

1  “Other Items” is a combination of Purchased Services, Casualties and Insurance, General and Administrative, Other Taxes, Loss and Damage, and Special Charges, price changes for all of which are measured by the Producer Price Index for Industrial Commodities Less Fuel and Related Products and Power.

 

2  Linking is necessitated by a change to the 2011 weights beginning in the fourth quarter 2012.  The following formula was used for the current quarter’s index:

 

            1st Qr. 2013 Index

                  (2011 Weights)     Times   4th Quarter Linked Index       Equals Linked Index

            4th Qr. 2012 Index                      (1980 = 100 Linked)          (Current Quarter)

                  (2011 Weights)

                                                            Or

            310.0   X  299.0  =  297.3

311.8

 

3  The first quarter 2013 RCAF was rebased using the October 1, 2012 level of 297.5 in accordance with the requirements of the Staggers Rail Act of 1980 (10/1/2012 = 100). For the purpose of calculating the fourth quarter 2012 linked index (2012Q4 = 100), where the fourth quarter 2012 linked index equals 100 after the forecast error adjustment, the fourth quarter 2012 RCAF is also recalculated using the October 1, 2012 level of 297.5.

 

4  The first quarter 2013 forecast error adjustment was calculated as follows:  (a) third quarter 2012 RCAF using forecasted data equals 97.3; (b) third quarter 2012 RCAF using actual data equals 97.1; and (c) the difference equals the forecast error (b-a) of -0.2.  Because the actual third quarter value is less than the forecast value, the difference is subtracted from the Preliminary RCAF.  Both the fourth quarter 2012 and the first quarter 2013 forecast error adjustments are recalculated using the October 1, 2012 level.