| SURFACE TRANSPORTATION BOARD DECISION DOCUMENT | |||
| Decision Information | |||
Docket Number:   | AB_33_255 | ||
Case Title:   | UNION PACIFIC RAILROAD COMPANY--ABANDONMENT--IN CARVER AND SCOTT COUNTIES, MINN. | ||
Decision Type:   | Decision | ||
Deciding Body:   | Director Of Proceedings | ||
| Decision Summary | |||
Decision Notes:   | DECISION GRANTED A REQUEST TO EXTEND THE CERTIFICATE OF INTERIM TRAIL USE OR ABANDONMENT NEGOTIATING PERIOD FOR A PORTION OF THE RIGHT-OF-WAY OF THE CHASKA INDUSTRIAL LEAD IN CARVER AND SCOTT COUNTIES, MINN. | ||
| Decision Attachments | |||
| 10 KB 22 KB 34 KB | |||
| Approximate download time at 28.8 kb: 32 Seconds | |||
If you do not have Acrobat Reader, or if you have problems reading our files with your current version of Acrobat Reader, the latest version of Acrobat Reader is available free at www.adobe.com. | |||
| Full Text of Decision | |||
|
41577 SERVICE DATE – APRIL 29, 2011 DO SURFACE TRANSPORTATION BOARD DECISION Docket No. AB 33 (Sub-No. 255) UNION PACIFIC RAILROAD COMPANY—ABANDONMENT—IN CARVER
AND SCOTT COUNTIES, MINN. Decided: April 28, 2011 By decision and certificate
of interim trail use or abandonment (CITU) served on April 1, 2008 (April
2008 decision), the Board granted the application filed by Union Pacific
Railroad Company (UP) for abandonment of its Chaska Industrial Lead, extending
from milepost 38.6, at Merriam, to milepost 33.0, on the east side of Chaska, a
distance of 5.6 miles, in Carver and Scott Counties, Minn. The abandonment was subject to public use,
environmental, historic preservation, and standard employee protective conditions,
as well as a trail use condition authorizing a 180‑day period for the Office
of Carver County Regional Rail Authority (CCRRA) to
negotiate an interim trail use/rail banking agreement with UP for the
right-of-way involved in this proceeding.[1] By a series of decisions, the most recent
served on January 28, 2011, the deadline to negotiate
the CITU was extended to April 30, 2011.
In this decision, the Board is again extending the CITU negotiating
period. By a pleading filed on
April 15, 2011, CCRRA and the Scott County Regional Rail Authority (SCRRA)
(collectively, the Authorities)[2] jointly
request a 6-month extension of the CITU negotiating period for the portion of
the right-of-way extending from milepost 38.0 to milepost 33.0.[3] The Authorities state that, while they were
unable to complete a purchase agreement and close on the property, they are on
track to consummate an agreement with UP for the acquisition of the line. In a pleading filed on April 21, 2011, UP concurs
in the request to extend the negotiating period as to the portion of the
right-of-way extending from milepost 38.0 to milepost 33.0 for 180 days, until October
27, 2011. Where, as here, the carrier is willing to continue trail
use negotiations, the CITU negotiating period may be extended.[4] An extension of time will promote the
establishment of trails and rail banking consistent with the National Trails
System Act, 16 U.S.C. § 1247(d). Accordingly,
the CITU negotiating period will be extended for 180 days from April 30, 2011 (until
October 27, 2011), for that portion of the line extending from milepost 38.0 to
milepost 33.0. This decision will not significantly affect either the
quality of the human environment or the conservation of energy resources. It is ordered: 1. The request to extend the CITU negotiating
period for the portion of the line between milepost 38.0 and milepost 33.0 is
granted. 2. The CITU
negotiating period for the portion of the line described above is extended
until October 27, 2011. 3. This decision
is effective on its service date. By the Board, Rachel D. Campbell, Director,
Office of Proceedings. [1] The environmental conditions imposed in the April 2008 decision remain in effect. The public use condition expired on October 12, 2008, and by statute cannot be extended. By decision served on September 2, 2010, the Board removed the historic preservation condition and authorized UP to remove 2 bridges located near milepost 36.17. [2] CCRRA filed
its original CITU and public use request on behalf of The Minnesota River
Valley Rail Preservation Project (MRVRPP), a collaboration
between CCRRA and 4 other bodies politic existing under Minnesota law and
interested in transportation, recreation, and public utilities. SCRRA is one of the bodies politic that
comprises MRVRPP. [3] The original
CITU included the entire right-of-way, extending from milepost 38.6 to milepost
33.0. In a CITU extension request filed
on August 17, 2010, SCRRA excluded the portion of the line from milepost 38.6
to milepost 38.0 from its CITU extension request. In a decision served on September 8, 2010,
the Board authorized UP to fully abandon the portion
of the right-of-way between milepost 38.6 and milepost 38.0, subject to meeting
the outstanding conditions imposed in the April 2008 decision. By letter filed on September 8, 2010, UP
stated that it has consummated the abandonment of that portion of the
right-of-way. [4] See Rail Abans.—Use of
Rights-of-Way as Trails—Supplemental Trails Act Procedures, 4 I.C.C.2d 152,
157-58 (1987). | |||