| SURFACE TRANSPORTATION BOARD DECISION DOCUMENT | |||
| Decision Information | |||
Docket Number:   | AB_290_266_X | ||
Case Title:   | NORFOLK SOUTHERN RAILWAY COMPANY--ABANDONMENT EXEMPTION--IN MCDOWELL COUNTY, N.C. | ||
Decision Type:   | Decision | ||
Deciding Body:   | Director Of Proceedings | ||
| Decision Summary | |||
Decision Notes:   | DECISION GRANTED THE CITY OF MARION'S REQUEST TO EXTEND THE NOTICE OF INTERIM TRAIL USE OR ABANDONMENT NEGOTIATING PERIOD TO OCTOBER 1, 2010. | ||
| Decision Attachments | |||
| 12 KB | |||
| Approximate download time at 28.8 kb: 20 Seconds | |||
If you do not have Acrobat Reader, or if you have problems reading our files with your current version of Acrobat Reader, the latest version of Acrobat Reader is available free at www.adobe.com. | |||
| Full Text of Decision | |||
|
40714 SERVICE DATE – APRIL 26, 2010 DO SURFACE TRANSPORTATION BOARD DECISION Docket No. AB 290 (Sub-No. 266X) Decided: April 23, 2010 Norfolk Southern Railway Company (NSR) filed a notice of exemption under 49 C.F.R. § 1152 Subpart F—Exempt Abandonments to abandon approximately 3.5 miles of railroad between milepost SB 205.0 and milepost SB 208.5, near Marion, in McDowell County, N.C. Notice of the exemption was served and published in the Federal Register on June 8, 2006 (71 Fed. Reg. 33,334). The exemption was scheduled to become effective on July 8, 2006. By decision and notice of interim trail use or abandonment (NITU) served on July 7, 2006, the proceeding was reopened and a 180-day period was authorized for the City of Marion, N.C. (City), to negotiate an agreement with NSR for interim trail use/rail banking and for a public use condition.[1] In the same decision, the Board imposed four environmental conditions: two stormwater conditions, an archaeological condition, and a National Geodetic Survey (NGS) consultation condition.[2] The negotiating period under the NITU was extended several times, with the latest extension expiring on April 1, 2010. On March 29, 2010, the City filed another request to extend the NITU negotiating period, until October 1, 2010.[3] The City states that it and its designated representatives have attempted with due diligence and in a timely manner to secure an interim trail use agreement with NSR. The City adds that NSR has performed an appraisal for the property on which an agreement hinges and that an initial and subsequent meetings have been held. The City further states that in light of the approaching deadline and the need for further negotiations, another extension of the negotiating period is needed. On March 30, 2010, NSR filed a letter stating that it has not consummated the abandonment, that it continues to negotiate with the City for an interim trail use agreement, and that it consents to the extension. Additionally, NSR requests an extension of the consummation notice filing deadline until 60 days after the expiration of the extended NITU negotiating period (until November 30, 2010).[4] Where, as
here, the carrier has not consummated the abandonment at the end of the
previously imposed negotiating period and has indicated its willingness to
continue negotiations, the Board retains jurisdiction, and the NITU negotiating
period may be extended. Under the
circumstances, further extension of the negotiating period is warranted. See Birt v. STB, 90 F.3d 580,
588-90 (D.C. Cir. 1996); This action will not significantly affect either the quality of the human environment or the conservation of energy resources. It is ordered: 1. The City’s request to extend the NITU negotiating period is granted. 2. NSR’s request to extend the time to exercise the abandonment authority is granted. 3. The negotiating period under the NITU is extended to October 1, 2010. 4. The authority to abandon must be exercised on or before November 30, 2010. 5. This decision is effective on its date of service. By the Board, Rachel D. Campbell, Director, Office of Proceedings. [1] The public use condition expired on January 4, 2007. [2] By decision served on November 1, 2006, the stormwater conditions and the archaeological condition were removed. The NGS consultation condition, however, remained in effect. [3] Although the
request slightly exceeds the customary request of 180 days, the Board has
granted such requests in the past. See,
e.g., Union Pacific Railroad Company—Abandonment Exemption—In [4] Under 49
C.F.R. § 1152.29(e) (2), a railroad may, for good cause shown, file a request
for an extension of time to file a notice of consummation in abandonment
proceedings. Because the same provision
permits the railroad to file a notice of consummation within 60 days after expiration
of a legal or regulatory barrier, such as a trail use condition, it is not
clear that NSR needs a separate extension of the deadline for filing a notice
of consummation in this situation. NSR’s request for that extension will nonetheless be
granted. | |||