Decision Notes:   | DECISION GRANTED THE APPLICATION OF THE CITY OF CHICAGO, ILLINOIS (THE CITY), SEEKING THE THIRD-PARTY OR “ADVERSE” ABANDONMENT OF 2 RAILROAD LINES IN THE CITY OWNED BY THE CHICAGO TERMINAL RAILROAD, SUBJECT TO ENVIRONMENTAL AND EMPLOYEE LABOR PROTECTION CONDITIONS. | ||
| Decision Attachments | |||
| 79 KB | |||
| Approximate download time at 28.8 kb: 74 Seconds | |||
If you do not have Acrobat Reader, or if you have problems reading our files with your current version of Acrobat Reader, the latest version of Acrobat Reader is available free at www.adobe.com. | |||
| Full Text of Decision | |||
|
40658 SERVICE DATE – JUNE 16, 2010 EB SURFACE TRANSPORTATION BOARD DECISION Docket No. AB 1036 THE CITY OF − ADVERSE ABANDONMENT − Decided: June 15, 2010 The Board is granting the application of the City of Chicago, Illinois (the City), seeking the third-party or “adverse” abandonment of 2 railroad lines in the City owned by the Chicago Terminal Railroad (CTR), subject to the environmental and labor protection conditions described below. BACKGROUND By
application filed under 49 U.S.C. § 10903 on February 1, 2010, the City seeks
the adverse abandonment of 2 CTR line segments in the City: (1) a portion of the Kingsbury Branch from
its southern terminus at the intersection of Kingsbury, Division, and Halstead Streets,
to, but not including, the point at which the Goose Island Branch diverges from
the Kingsbury Branch at or near Willow Street, a distance of approximately 6
city blocks (.75 miles) (the Kingsbury segment); and (2) a portion of the
Lakewood Avenue Line between the southwest right-of-way line of Clybourn Avenue
and the Line’s northern terminus at Diversey Parkway, a distance of
approximately 7 city blocks (.875 miles) (the Lakewood segment).[1] These segments either run parallel to, or,
for much of their length, are located within the right-of-way of 2 city streets
– According
to the City, adverse abandonment is justified because: (1) there is no present or reasonably
foreseeable future need for rail service on the segments; (2) the properties
adjacent to these city streets have become largely residential and retail in
recent years; (3) the City and the local alderman have received complaints that
the trackage in those streets has caused personal injury and property damage;
and (4) the presence of the trackage increases the cost of reconstruction or
realignment of those streets. In
particular, the City states that it will save some $1.3 million in the planned
reconstruction of Notice of the application was served on February 18, 2010, and published in the Federal Register on February 23, 2010, at 75 Fed. Reg. 8179. By decision served on March 4, 2010, the Board held this proceeding in abeyance and extended all procedural dates by 30 days to facilitate settlement discussions between the City and CTR. CTR had indicated its opposition to adverse abandonment at the waiver stage of the proceeding, arguing that: (1) it was actively seeking to develop traffic; (2) the neighborhood has future traffic potential; (3) the lines were needed for empty car storage; (4) the lines could be used for holding future inbound loads prior to delivery; and (5) the traffic-increasing effects of “climate legislation” and higher fuel prices should be considered. On
March 18, 2010, comments were filed by Andrew Morris, “an individual resident
of the City of By
letter filed on March 29, 2010, CTR informed the Board that CTR and the City
have negotiated a settlement of their differences in this proceeding. CTR stated that, pursuant to the settlement, it
would not oppose the City’s application and that CTR and the City were
requesting that the Board terminate its abeyance of the proceeding and
establish a revised procedural schedule.
By letter dated March 30, 2010, CTR also asked to withdraw 2 motions in
light of the settlement agreement. In
those motions, CTR had requested (1) remedies and sanctions for the City’s
alleged involvement in the prior removal of track on the On April 30, 2010, the City filed a statement in rebuttal to the comments of Mr. Morris. In its rebuttal statement, the City asks the Board to reject his comments for lack of standing and also addresses the substance of his comments. On that same date, CTR filed a letter seeking expeditious consideration of the application and a decision approving it by May 30, 2010, effective on its service date. On May 17, 2010, the Deputy Commissioner of the Department of Transportation for the City (Deputy Commissioner) filed a similar request. The Deputy Commissioner states that the City is anxious to move forward with the track removal and street repairs. PRELIMINARY MATTER The City argues that we should reject the comments of Mr. Morris because he lacks standing to file them. The City maintains that Mr. Morris does not have standing because he has neither alleged nor shown that the proposed abandonment would injure him in any way. As authority for its argument that standing is required to oppose an abandonment at the Board, the City cites cases applying the constitutional minimum requirements for standing to raise issues in the federal courts.[3] But those cases do not address adjudications before regulatory agencies like the STB that seek comments from the public on whether a requested Board action is in the public interest. Our regulations allow interested persons to file comments in abandonment proceedings addressing public interest matters and expressly provide that the commenter need not be an actual user of the line at issue.[4] Mr. Morris has demonstrated that he is interested in this transaction because he believes that there is a public need for continued rail service over the Kingsbury segment. Therefore, we will accept the comments of Mr. Morris. DISCUSSION AND CONCLUSIONS Legal standard.
Under 49 U.S.C. § 10903(d), the standard governing any application for
authority to abandon a line of railroad is whether the present or future public
convenience and necessity (PC&N) require or permit the proposed
abandonment. In applying this standard
in an adverse abandonment context, we consider whether there is a present or future
public need for rail service over the line and whether that need is outweighed
by other interests.[5] As part of our PC&N analysis, we must
consider whether the proposed abandonment would have a serious, adverse impact
on rural and community development. We
also consider the environmental and energy impacts of
the proposed abandonment, and, pursuant to 49 U.S.C. § 10903(b)(2), we must ensure that affected rail employees will be
adequately protected. We have exclusive and plenary jurisdiction over rail abandonments.[6] We typically preserve and promote continued
rail service where a carrier has expressed a desire to continue operations and
has taken reasonable steps to acquire traffic.[7] On the other hand, we do not allow our
jurisdiction to be used to shield a line from the legitimate processes of state
law where no overriding federal interest exists.[8] In an adverse abandonment case, if we
conclude that the PC&N does not require or permit continued rail operation
over the line, our decision removes the shield of our
jurisdiction, enabling the applicant to pursue other legal remedies to force
the carrier off a line.[9] PC&N analysis. Applying these principles, we find, on
balance, that the present or future PC&N requires or permits the proposed
abandonment. CTR, the affected rail
carrier, now supports this finding, and no shippers have opposed the proposed
abandonment. As explained below, there
is no present need for rail service over the line segments and little
likelihood of a need for future rail service over them. The record shows that abandonment of the
segments would not adversely affect rural and community development. The City has demonstrated that the Chicago‑area
public has a substantial interest in termination of rail use of the involved right-of-ways. Present need for rail service. There is no present need for rail use of the
line segments. No rail traffic is currently
originated, terminated, or bridged over the segments, and no shipper has
opposed the abandonment proposal. Except
for a single test shipment of firewood in 2007, there has been no rail service
over the Kingsbury segment for the last 10 years.[10] There has been no freight traffic over the Future need for
rail service. We find that it
is highly unlikely that there will be a need for future rail service over either
segment. Again, no shipper has opposed
the City’s application or stated a need for future rail service. Relocation of future shippers into the area
is unlikely, because the segments are located in a densely populated urban area
that has transitioned from industrial to predominantly retail/residential, with
the area’s zoning largely discouraging uses that would generate rail traffic.[13] Also, any future movement of rail cars over
the Kingsbury segment could be inefficient and require safety mitigation, as
the line is located in the middle of a public street that is being developed
for retail use.[14] A portion of the Mr. Morris disputes the City’s claim
that the Kingsbury segment serves no public need. In his statement, Mr. Morris argues that there
is a carrier (CTR) that is “ready, willing, and able” to operate over the
Kingsbury segment and that adverse abandonments are seldom granted where this
is true. Concerning the Kingsbury
segment’s future traffic potential, Mr. Morris disputes what he maintains to be
the City’s position that its zoning code has closed the 2 parcels in the south
end of the Kingsbury segment (referenced on page 12 of witness Zalmezak’s
testimony) to industrial use and asserts that, for the small, oddly shaped
parcel, it may be possible for the City to obtain a creative proposal for a
manufacturing facility for the property. We find unpersuasive Mr. Morris’ attempt to show that there
is a public need for rail service over the Kingsbury segment. In light of the settlement reached between
the City and CTR, Mr. Morris is incorrect in positing that CTR remains willing
to operate over the Kingsbury segment. Mr.
Morris has not refuted the City’s statement that, except for an isolated test
shipment of firewood, there has been no rail use of the Kingsbury segment for
10 years. Moreover, the mere possibility
of a creative proposal for manufacturing for an oddly shaped parcel is far too
speculative to show a need or potential for future rail service on this
segment. Mr. Morris acknowledges that the
size of the lots would make them unlikely to generate rail traffic. [18] Even if, as Mr. Morris contends, the zoning
for the 2 south‑end properties were not as restrictive as the City
maintains, any future rail operations over the Kingsbury segment could be
inefficient and require safety mitigation because the line is located in the
middle of a public street that is being developed for retail use. The value of such service to future shippers
would be questionable because of the expense and delay that would be connected
with these problems. Public interest
in termination. The City has
made a persuasive showing that abandoning these line segments would serve the
public interest.[19] The removal or paving-over of the Mr. Morris agrees that public
interest considerations favor abandonment of service over the We disagree with Mr. Morris’ arguments regarding the public
interest. The added street maintenance
cost imposed on a city by the continuation of the potential for future rail
service is a factor to consider in evaluating whether continued rail service is
in the public interest. As noted by Mr.
Morris, this type of cost is only one factor that must be weighed against other
considerations that might favor the continuation of rail service. Here, however, the street maintenance cost
attributable to the track is not outweighed by other considerations; there is no
present traffic, and there is only a very remote likelihood of future traffic. Although railroad safety is, as observed by
Mr. Morris, primarily under the jurisdiction of the Federal Railroad
Administration, safety issues arising out of the presence of railroad track are
also a relevant public interest consideration in STB proceedings.[21] Thus, even if CTR had been willing to mount
the considerable effort that would be required to attract future traffic to the
Kingsbury segment, the City would still have a strong public interest in
avoiding the safety and environmental problems that could arise from reviving
rail operations in the middle of a busy commercial/residential street. Rural and community
development. Because the
segments are located in an urban area and are not needed for current or future
rail service, we also find that their abandonment will not harm rural or community
interests, much less have a “serious, adverse impact on rural and community development.” See 49 U.S.C. § 10903(d). Environmental matters. The Board is required to consider the
environmental and energy impacts of the proposed abandonment. The City has submitted a combined
environmental and historic report with its application, and notified the
appropriate federal, state, and local agencies of the opportunity to submit
information concerning the energy and environmental impacts of the proposed
abandonment. See 49 C.F.R. § 1105.11. The Board’s Section of Environmental Analysis
(SEA) has examined the environmental report, verified its data, and analyzed
the probable effects of the proposed action on the quality of the human
environment. SEA served an Environmental
Assessment (EA) on March 5, 2010.
Public comments on the EA were due by April 5, 2010, but none were filed. In the EA, SEA states that the National Geodetic Survey
(NGS) has advised that it has identified a geodetic station marker that may be
affected by the proposed abandonment.
SEA therefore recommends that we impose a condition requiring that the
City consult with NGS and notify NGS at least 90 days prior to beginning any
activities that would disturb or destroy any geodetic station markers. We will impose the condition recommended by SEA. Based on SEA’s recommendations, we conclude
that the proposed abandonment, if implemented as conditioned, will not
significantly affect either the quality of the human environment or the
conservation of energy resources. Labor protection. In approving this application, we must ensure
that affected rail employees will be adequately protected. 49 U.S.C. § 10903(b)(2). Therefore, we will impose the conditions set
forth in Oregon Short Line Railroad – Abandonment Goshen Branch Between
Firth and Ammon, in Bingham and Bonneville Counties, Idaho, 360 I.C.C. 91
(1979). OFA, public use, and trail use. As noted, we already have exempted this
adverse abandonment from the OFA provisions of 49 U.S.C. § 10904 and from the
public use condition provisions of 49 U.S.C. § 10905. We have deferred ruling on the City’s request
for waiver of the trail use provisions of 49 C.F.R. § 1152.29 until we
rule on the adverse abandonment application.
Because trail use requests were due by March 18, 2010, and none were filed,
the City’s request for a waiver is now moot.
Accordingly, we will not entertain OFA, public use, or trail use
requests in this proceeding. Expedited consideration. CTR and the Deputy Commissioner have
requested that we expeditiously consider and grant the application. They also request that we make our decision
effective on the service date of our decision rather than the typical 30 days
from the date of service. They have
failed, however, to justify eliminating our typical 30-day notice period. It is ordered: 1. The City’s
adverse abandonment application is granted, subject to the employee protective
conditions in Oregon Short Line Railroad – Abandonment Goshen Branch Between
Firth and Ammon, in Bingham and Bonneville Counties, Idaho, 360 I.C.C. 91
(1979), and subject to the condition that the City shall
consult with NGS prior to beginning any activity that will disturb or destroy
any geodetic station markers. If NGS
identifies geodetic station markers that may be affected by the proposed
abandonment, the City shall notify NGS at least 90 days prior to beginning
activities that will disturb or destroy any
geodetic station markers in order to plan for the possible
relocation of the geodetic station markers by NGS. 2. The requests by CTR and the Deputy
Commissioner for an expedited effective date are denied. 3. The City’s request for a trail use waiver is
denied as moot. 4.
This decision will be effective on July 16, 2010. By the Board,
Chairman Elliott, Vice Chairman Mulvey, and
Commissioner Nottingham. [1] Before the application was filed, the Board
granted various waivers and exemptions requested by the City. See The City of [2] See [3] The City cites: Lujan v. Defenders of Wildlife, 504 [4] See 49 C.F.R. § 1152.25(a)(1) (“… Interested persons may become parties to an
abandonment or discontinuance proceeding by filing written comments or protests
with the Board.…”) (Emphasis added). Under § 1152.25(a)(1)(ii)(B),
if a protestant does not use the line, the protest must contain “information
concerning the group or public interest it represents” (emphasis added). [5] [7] See Chelsea Property Owners − Aban. − Portion of the Consol. Rail Corp.’s West 30th Street Secondary Track in New York, N.Y., 8 I.C.C.2d 773, 779 (1992) (Chelsea), aff’d sub nom., Consol. Rail Corp. v. I.C.C., 29 F.3d 706 (D.C. Cir. 1994) (Conrail). [8] See [13] V.S. Zalmezak 10-14. Two Kingsbury segment parcels are zoned for
commercial or light industrial use, but witness Zalmezak has shown that these
parcels are not likely to attract future rail service. V. S. Zalmezak 12-13. [14] Retail properties adjacent to the Kingsbury
segment include a new Whole Foods grocery complex, Fantasy Kingdom (a
children’s birthday party facility and indoor play center), a British oriented
educational facility (V.S. Zalmezak 2-3), and a bicycle equipment company that